Keyword Analysis & Research: ascope pmesii pt crosswalk


Keyword Analysis


Keyword Research: People who searched ascope pmesii pt crosswalk also searched

Frequently Asked Questions

What is PMESII-PT used for?

2-44. PMESII-PT is a memory aid for the eight operational variables that make up any OE. When listing the variables, it is therefore advisable to list them in the same order as in the memory aid. However, this sequence does not mean that one always addresses and analyzes the variables in a particular order.

What is included in a PMESII exercise design?

Exercise Design These items include exercise parameters; task and countertask development; PMESII-PT OE development; orders, plans, and instructions; and typical briefings, conferences, and control documents. The right- hand column contains page references in TC 7-101 for each step/task and action required.

What does PMESII stand for?

The Army uses variables of political, military, economic, social, information, infrastructure, operational physical environment, and time (PMESII-PT) to analyze and describe the conditions of an OE. These operational variables influence each other to varied degrees dependent on time and in a particular conditions continuum of actions.

What is the PMESII-PT variable?

PMESII-PT variable of the operational environment (OE). Guide to the Political Variable The political variable is aimed at the total political power within a given operational environment (OE).

Search Results related to ascope pmesii pt crosswalk on Search Engine